Offline80.221.91.195:28015checked 12d ago
MS Project | SOLO/DUO
Players
Every five minutes, from the Steam server list.
Hourly average and peak, UTC.
Daily average and peak, UTC.
Server performance
48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.
Rank
daily · 1 is bestTop 70% of all ranked servers. Ranked on player hours over the last seven days.
Wipe schedule
too few wipes seen yetNot enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.
The first 48 hours of its last wipes
Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.
Wipes
newest first| Wiped | Peak | Crowd | Lasted | Players before |
|---|---|---|---|---|
| Sat 26 Sep, 09:07 UTC18d ago | 1 | – | running | 1 |
| Thu 17 Sep, 20:03 UTC27d ago | 1 | halved by day 1 | 8.5 days | 0 |
Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.
Similar servers
the same kind of game, then region, group limit, rate and wipesQuick answers
from the figures on this pageSettings and map
What are the server rules for MS Project | SOLO/DUO?
The name of MS Project | SOLO/DUO does not state a gather rate. Groups are capped at 8 players, the default in the game. survival is the game mode, gather, build, raid: the standard game. Fighting and raiding between players is allowed. You will find it in the Modded section: the game is changed by plugins or settings. Carbon plugins are running on it. VAC is on, Valve's anti-cheat.
What is the map on MS Project | SOLO/DUO?
The game generates a procedural map of size 3,500 with seed 789936933 for MS Project | SOLO/DUO. The map is identical for the same size and seed, so it can be viewed on RustMaps from this page.
Server tags
Where can MS Project | SOLO/DUO be found in Rust Player Count lists and filters?
These Rust Player Count lists include MS Project | SOLO/DUO: Modded Rust servers. These filters bring it up on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.
What is the meaning of the tags on MS Project | SOLO/DUO?
These are the tags MS Project | SOLO/DUO publishes for the game's server browser: gmrust (Game mode): The usual Rust survival experience; mp25 (Max players): 25 slots are available; ts8 (Group limit): This uses the default team cap: 8 players; v2633 (Protocol): Joining requires the same protocol: 2633; cs162929 (Build): It runs on game build 162929; ptrak (Networking): The network layer is RakNet, Rust's standard one; $r? (Region code): A region code is not present; ^z (Modded): This server is Modded; plugins or settings affect how it plays; ^y (Carbon): It uses Carbon for plugins. At the top of this page, its tags show its current players, queue and world creation time as well.
Population
How full is MS Project | SOLO/DUO?
The server MS Project | SOLO/DUO is offline at present, with its last appearance 12 days 8 hours ago.
How does MS Project | SOLO/DUO compare in server rankings?
Over the last seven days, MS Project | SOLO/DUO is #15,948 for player hours, placing it in the top 70% of ranked servers.
Server information
What is the online status and reliability of MS Project | SOLO/DUO?
MS Project | SOLO/DUO is down at the moment and was last seen 12 days 8 hours ago. It was up 0% of the time over the last 7 full days, 0 of 168 hours. Its first appearance in Rust Player Count was on 13 September 2026.
What is the Rust version for MS Project | SOLO/DUO?
Linux hosts MS Project | SOLO/DUO, which runs Rust network protocol 2633 and build 162929. The protocol has to match for you to join, but Steam updates it without any action from you.
What is the location of MS Project | SOLO/DUO?
A region is not published by MS Project | SOLO/DUO. Rust Player Count displays the location a server claims, not the physical location of the machine. It is located at 80.221.91.195:28015.
Wipe schedule
What happens on MS Project | SOLO/DUO when a wipe occurs?
Recent wipes saw an average peak of 1 players. 0 hours after the wipe, the crowd on the latest wipe was at its highest. Half that peak was maintained until the next wipe in 0% of recent wipes. If not, the crowd went below half by day 1.
When does MS Project | SOLO/DUO wipe?
The rhythm of wipes on MS Project | SOLO/DUO cannot be told yet, since too few are on record. On Thursday 5 November at 19:00 UTC the next monthly force wipe arrives, wiping every Rust server. It has been running its current world for 18 days 19 hours.
How to join
How can I connect to MS Project | SOLO/DUO?
Joining is done by opening the console (F1) and running client.connect 80.221.91.195:28015. Another way is the Launch Rust option on this page, which uses Steam to start Rust and put you in.
Server tags
what each one meansPublished as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y
Game
gmrust
mp25
ts8
v2633
cs162929
ptrak
$r?
Mods and access
^z
^y
Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.